Dedicated and safe cycle lanes
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, suggests that dedicated and safe cycle lanes are:
Marked-out and clearly signed routes to accommodate building users arriving on and travelling through the assessed site on a bicycle. They must also have the following features:
- Adequate external lighting in accordance with BS 5489-1:2013 Lighting of roads and public amenity areas.
- Appropriate sized, designed and constructed. The following publications offer guidance on how to demonstrate this:
- a) Local transport Note 2/08 Cycle infrastructure design, Department of Transport, 2008
- b) Sustrans design guidance (http://www.sustrans.org.uk), specifically the Sustrans design manual handbook for cycle-friendly design.
[edit] Related articles on Designing Buildings Wiki
- Are electric bikes the future?
- BRE articles.
- BREEAM.
- Building Research Establishment.
- China has just built the world’s longest elevated cycle path.
- Cycle path.
- Cycle storage.
- Cycling and walking plan.
- Dedicated and safe footpaths.
- Designing for cycle traffic.
- Dedicated pedestrian crossing.
- Gearing up for active travel.
- Healthy Streets.
- Highways.
- Integrated transport system.
- Micromobility.
- Pop-up cycle lanes.
- Sustainable transport.
- Sustaining walking and cycling measures after COVID-19.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.